Total Project Cost Reduction
8
The residential market encompasses much more than
the single-family home. Apartment complexes and
high-rise condos have different needs than a 2,000-
square-foot house. Large, repetitive areas, firewalls and
steel stud construction are a few differences that lead to
unique needs. Labor becomes more significant, so
improving efficiency plays a central role in lowering total
project costs. Thomas & Betts offers you solutions to
help drive efficiency improvements, saving time, cutting
labor costs and reducing overall project costs.
Draft-Tight Boxes
• Reduce energy consumption and eliminate the need
for sealant and caulk on the building envelope
Adjust-A-Box
®
Solutions
• Adjust to wall thickness for always-flush finish and reduce
the need for extension “goof” rings
PH Solutions
• Phenolic boxes eliminate expensive putty pads or mineral
wool insulation in a 2-hour firewall
• Install boxes in the same stud cavity facing opposite
directions and eliminate the need for alternate construction
Compression Connectors, Grounding Systems
and Ergonomic Compression Tools
• Featuring the Color-Keyed
®
Compression System
that ensures proper connections
• Design/quote/order custom lugs easily using the Online
Configurator to meet the needs of any project — with
guaranteed two-week shipment
• Fewer crimps yield superior terminations
Steel City
®
Prefabricated Electrical
Rough-In Solutions
Steel City
®
Electrical Rough-In
Components
Steel City
®
Fire Alarm Boxes
and Accessories
Kindorf
®
Modular Metal Framing
System and Accessories
Blackburn
®
Ergonomic
Compression Tools
Prefabricated Rough-In Assemblies
and Labor-Saving Rough-In Components
• Labor Savings
— Custom-designed assemblies of
components can save over 50% on your in-wall rough-
in installation costs
• Material Savings
— Special ARRA and Buy-America
assemblies reduce overall material costs by up to 40%
• Logistics Savings
— Project-specific packaging,
labeling and just-in-time direct deliveries the day
needed cut material-handling and inventory costs
• Reduced Waste
— Pre-assembled, palletized
components reduce onsite packaging and waste
• Process Improvements
— Steel City
®
Prefabricator lets
you design, manage, quote and order your own in-wall
rough-in electrical systems specific for your project
Modular Metal Framing System and Accessories
• Labor Savings
— Unique punched framing channels
and innovative hardware products cut installation time
by over 40% over typical mechanical framing systems
• Material and Inventory Savings
— Unique 1
1
2
" design
requires fewer fittings, lowering jobsite inventory
• Reduced Waste
— Integral and easy-to-use
measuring system means exact cuts and less scrap
• Sustainable Finish
— Galv-Krom
®
trivalent finish
offers more than double the corrosion resistance
of pre-galvanized product and won’t form white rust
when stored outdoors
1,2,3,4,5,6,7 9,10,11,12,13,14,15,16,17,18,...20