Continuous Operation & Sustainability
Cyberex
®
Industrial UPS Systems
10
The costs associated with downtime in chemical
operations can be as high as $1 million per hour.
If power is lost during production, the current
production may have to be scrapped along with
the process equipment.
Due to the high cost of downtime, chemical facilities
use better performing materials and products to
minimize maintenance, and they perform preventive
maintenance at specific intervals instead of waiting
for equipment failure.
If plant downtime is experienced, Thomas & Betts offers:
• The capability to get your electrical system back up
and running quickly
• A deep product offering to standardize your electrica
system and ensure that you have the products you need
on hand to minimize downtime
• Long-lasting electrical systems to extend the plant life
cycle, reduce your capital expenditures and increase
operational equipment effectiveness (OEE)
• Installation training certification to ensure plant sustainability
Industrial UPS Systems
• Developed to UL
®
standards and designed
for a 20-year service life
• Ranges from 10 to 150kVA, incorporating
state-of-the-art system topology for higher online
system efficiency and longer battery life
Blackburn
®
Motor Lead Disconnects
Motor Lead Disconnects
• Quick, reliable change-out of electric motors
with no bolting, taping or loose connections
• Minimize motor downtime
• Offer the only pin-spring and insulation system
on the market
• Featuring the Color-Keyed
®
Compression System
that ensures proper connections
Compression Lugs
• Provide robust performance and reliability
with the T&B installation method
• Accommodate both code and flex cable
on the same lug
• Eliminate the need for additional SKUs to
accommodate lugs for both cable types
• Featuring the Color-Keyed
®
Compression
System that ensures proper connections
Nylon Cable Protection Systems
• Protect power cables, data lines and control leads
• Provide high impact strength even at low temperatures
• Weather resistant
Blackburn
®
Compression Lugs
PMA
®
High-Temperature Nylon
Conduit and Fittings
1,2,3,4,5,6,7,8,9 11,12,13,14,15,16,17,18,19,20,...32