Total Project Cost Reduction
11
PreFabricator
— Design/build/quote/order/manage your
“in-wall” rough-in system using the Steel City PreFabricator
online tool
ARRA/Buy America Assemblies
— Extend savings into
material costs on integrated components transformed into
compliant product
Life Safety System Support, Protection
and Termination
— NEC
®
compliant and save on labor
and material costs with pre-identified components
• Custom-designed assemblies to specifically save money
unique to every project
• Superior logistics for material handling provides
inventory savings
• Palletized/packaged/identified per floor, room or location
to save time with material handling
• Shipments on site, on or before the day needed,
to minimize costly waiting periods
1...,2,3,4,5,6,7,8,9,10 12